
Scavenging browsing Mobile
Hot Search: SSM3K35MFV SSM3J36MFV 2SK3376TT-B
3 mm Square SMT Trimmer Potentiometers EVM7JSX30BE4 22KΩ/Ohm 3X4-22K marking E4
| 电阻值 Resistance |
22KΩ/Ohm |
| 额定功率 Power |
0.05W,1/20W |
| 容差 Tolerance |
±25% |
| 温度系数 Temperature Coefficient |
±250 ppm/°C |
| 圈数 Number of Turns |
单圈 Single |
| 调节类型 Adjustment Type |
顶部调节 Top Adjustment |
| 端子类型 Termination Style |
J引线 J Lead |
| Description & Applications | ●3 mm Square SMT Trimmer Potentiometers (Cermet, Open Frame Type) Features ● 3 mm square types for flow and reflow soldering ● Labor cost saving filmless sealed construction (EVM7J/7L) ● Automatic adjustment type (EVM7L) ● Recommended Applications ●Audio visual equipment, Communication equipment ●Other general electronic equipment |
| 描述与应用 | ●3mmSMT微调电位器 (陶瓷,开架式) 特点 ●3毫米见方的类型和回流焊接 ●节约劳动成本无胶片密封 (EVM7J/7L) ●自动调整型(EVM7L) ●推荐应用 ●视听设备,通讯设备 ●其他一般电子设备 |
